PROJECT OVERVIEW

The project involved remedial works to entire 7 storey unit complex. The building was built of a framed concrete structure with concrete columns and slabs. The walls were constructed hebal blocks with no cavity and cementitious render. The south-east and south-west corners of the building had severe water penetration problems requiring major repairs to the façade, windows replacement and waterproofing to all units with the exception of 3 x units. Red Eye Constructions were engaged to undertake the remedial works for the entire apartment complex which included:

SCOPE OF WORKS

  • Concrete repairs.

  • Repair of expansion joints.

  • Repair and replacement of Hebel blocks

  • Render repairs over Hebel blocks

  • Installation of helities

  • Window replacement (removal of existing & install new)

  • Façade membrane coating and painting

KEY TRADES UTILISED

  • Scaffold

  • Formwork & Concrete

  • Windows (Aluminium glazing)

  • Waterproofing & Tiling

  • Painting